Percent Change Calculator from old to new

Going from 80 to 100 is a 25% increase: subtract (100 − 80 = 20), divide by the original (20 ÷ 80 = 0.25) and multiply by 100. Going back from 100 to 80 is only a 20% decrease — the base is different.

Years, months, etc. Leave at 1 for a simple change.

Your result

Percent increase

+25%

Absolute change
+20
New as % of original
125%
Reverse change (new → original)
-20%
If values are percentages: point change
+20 pts

Step-by-step working

  1. Change = 100 − 80 = 20
  2. Divide by the original: 20 ÷ |80| = 0.25
  3. × 100 = 25%

Understand it

What the Percent Change Calculator Does

Percent change measures how much a value has grown or shrunk relative to where it started. It is the standard way to report price rises, salary increases, stock moves, population growth and survey shifts.

This calculator gives the percent change, the reverse change, and — if your values are already percentages, like interest rates or poll results — the change in percentage points. Add a number of periods to get the compound annual growth rate (CAGR).

How the Percent Change Formula Works

Percent change = (new − old) ÷ |old| × 100 Percentage points = new% − old% CAGR = (new ÷ old)^(1/n) − 1
old
original value (cannot be 0)
n
number of periods for compound growth

Worked Examples

Rent from $1,500 to $1,650

Original value: 1,500 · New value: 1,650 · Number of periods (for CAGR): 1

Percent increase+10%

A +10% rise.

Stock from $120 to $90

Original value: 120 · New value: 90 · Number of periods (for CAGR): 1

Percent decrease-25%

A -25% fall; it needs 33.33% to recover.

Revenue doubles in 5 years

Original value: 1 · New value: 2 · Number of periods (for CAGR): 5

Percent increase+100%

That is 14.87% per year compounded.

Original analysis

Percent Change Analysis in numbers

Every chart below is generated from the same tested formula that powers the calculator above, so you can see the patterns behind a single result.

Percent vs percentage points

If a mortgage rate goes from 4% to 5%, it rose by 1 percentage point but by 25 percent. Headlines often mix these up; both are correct, but they answer different questions.

+1 ptPercentage-point change
+25%Percent change
  • Simple (total ÷ years)
  • Compound (CAGR)
Annual rate implied by doubling over n yearsSimple (total ÷ years), Compound (CAGR)0%10%20%30%40%50%2 yrs3 yrs5 yrs7 yrs10 yrs15 yrs20 yrsYears to double
View data table
Years to doubleSimple (total ÷ years)Compound (CAGR)
2 yrs50%41.4%
3 yrs33.3%26%
5 yrs20%14.9%
7 yrs14.3%10.4%
10 yrs10%7.2%
15 yrs6.7%4.7%
20 yrs5%3.5%

Simple total vs compound annual growth

A 100% gain over 10 years is not 10% a year. Compounded, it is about 7.18% a year. Dividing the total by the years overstates the annual rate, and the gap grows with longer periods.

Common Percent Change Questions

How do I calculate a percentage increase?

Subtract the old value from the new value, divide by the old value, and multiply by 100. A positive result is an increase.

How do I calculate a percentage decrease?

Use the same formula; the result will be negative. From 50 to 40: (40 − 50) ÷ 50 × 100 = −20%.

Tips and Common Mistakes

  • Always divide by the original (old) value, not the new one.
  • When the old value is negative, divide by its absolute value to keep the sign meaningful.
  • Report percentage points for changes in rates, percent change for changes in amounts.

Frequently asked questions

What is the formula for percent change?

(New − Old) ÷ |Old| × 100.

Can percent change be more than 100%?

Yes. Going from 50 to 150 is a 200% increase. Decreases, however, can’t exceed 100% for positive values.

What is the difference between percent change and percent difference?

Percent change has a clear starting point (old → new). Percent difference compares two values without an order, dividing by their average.

What is CAGR?

Compound annual growth rate: the steady yearly rate that would take the old value to the new value over the given number of years.

Sources and methodology

Last reviewed

byBhuvanesh S. Runs through our automated test suite on every build.

Results are estimates. Double-check anything important before relying on it.